PROJECT ID: AKM-003 commercial

Arabella Country Club.

Engineered Area

12,000 sqm

Execution Timeline

2007 - 2008

Scope of Work

Landscape Implementation

Arabella Country Club

Implementation Scope

Arabella Country Club required a landscape that exudes exclusivity and leisure. Our execution focused on flow—creating seamless transitions between sports courts, pools, and social lounges using lush buffers.

"Exclusive leisure spaces where sports and relaxation merge seamlessly."

Execution Parameters

The build focused on durability and luxury. We used premium stone for pathways to withstand golf carts and heavy foot traffic, while installing an invisible, high-tech irrigation system to keep the extensive greens pristine.

Durable Paths

Reinforced substructures for pathways.

Turf Management

Professional-grade turf installation.

Smart Sprinklers

Automated timing for optimal watering.

Ongoing Care

Setup for easy specialized maintenance.

Photographic Documentation

format_quote
"We do not decorate the earth. We engineer its enduring potential."
— Essam Abdel Aziz, Founder